Microsoft retires Project Online on Sept 30, 2026 — a good month to switch. Start a Ganttry trial →
Ganttry GANTTRY
Sign in Start free trial
CPM SCHEDULING IN THE BROWSER

Critical-path scheduling, finally built for teams.

Dependency-driven schedules, a live Gantt, baselines, statusing and DCMA health checks — with your whole crew on one shared schedule instead of seventeen versions of an .mpp file.

Start your 14-day trial See the demo →
$20 per user, per month · Imports MS Project & P6 · Cancel anytime
SR-12 Bridge Replacement Active
MR
DK
JT
✓ Saved 1:21 PM
New Open Task Link Critical Baseline Status
# Task Dur Start
1 ▾ SR-12 Bridge Replacement 64d Jun 1
2 Notice to Proceed 0 Jun 1
3 Mobilization 5d Jun 1
4 ▾ Substructure 20d Jun 8
5 Drilled shafts 12d Jun 8
6 Pier caps 8d Jun 24
7 ▾ Superstructure 16d Jul 6
8 Set girders 6d Jul 6
9 Deck pour & cure 10d Jul 14
10 Rails & approach 7d Jul 28
Jun '26JulAugSep
Maria · statusing
Dan · viewing
3 people on this schedule right now — zero emailed files

Scheduling software went stagnant. The prices didn't.

The tools running today's biggest projects were designed for one licensed desktop and a printer. Everything around them moved on.

Schedule_Rev7_FINAL(2).mpp

The file shuffle

The schedule lives in an email attachment, and nobody is sure which version is real. Updates mean re-sending the whole file — again.

$2,500+ / user / year

The seat ransom

Enterprise schedulers price per seat like it's 2003 — so only one person gets a license, and everyone else works from stale PDFs.

C:\ one licensed desktop

The one-desktop bottleneck

The schedule opens on exactly one machine. Field, PMs and owners wait in line — or wait for the monthly printout.

Even Microsoft is retiring Project Online this September. It's a good year to move to something that's moving.

One schedule. Everyone on it.

Ganttry is multi-tenant from the ground up. Companies, groups and per-membership roles decide exactly who sees what — enforced by the server, not hidden by a button.

Northcore USA
Paving group admin of one
Structures group member of another

Your org, mapped

Split a company into groups — regions, divisions, crews. Roles are per membership, so the same person can run one group and just read another. A schedule outside your tenant isn't hidden; it's a 404.

Someone saved first — review
Deck pour10d12d
Girders · %40%55%
Use theirsKeep mineSave as copy

No silent overwrites

Saves use optimistic locking. If a teammate saved first, a conflict review shows exactly what differs, field by field — use theirs, keep yours, or split a copy. Nothing is ever clobbered quietly.

History — SR-12 Bridge
Today 1:21 PM · MariaRoll back
Today 9:04 AM · DanRoll back
Jul 10 4:47 PM · MariaBranch new

Every save, recoverable

Server revisions per author, kept automatically. Roll back reversibly — the state you leave is snapshotted first — or branch any point in time into a fresh schedule.

Everything you left the desktop for

A real scheduling engine — not a task board with a timeline view. If P6 or MS Project taught you a habit, it works here.

Real dependency logic

FS, SS, FF and SF links with lag and lead — MS Project syntax like 12FS+3d. References renumber themselves.

Constraints, float & deadlines

Four constraint types, a CPM backward pass, and negative float that shows up red everywhere it matters.

Named baselines

Keep five. Variance columns in working days, gray baseline bars under the live plan, MS Project sign convention.

Monthly statusing

Set the data date, record actuals in one dialog. Retained logic, out-of-sequence flags — and one Ctrl+Z undoes the round.

Working calendars

Named calendars per task: 6-day paving crews, 4×10 weeks, annual winter shutdowns, holiday rules.

Cost & cash flow

Cost-load tasks and get planned / earned / baseline S-curves, a monthly table, and an extra Excel worksheet.

DCMA health checks

A 13-point schedule-quality audit with editable thresholds and a letterhead PDF report for submittals.

Crew loading

A histogram of planned crew per working day under the chart, with per-role breakdowns on hover.

See every feature with examples in the Cheat Sheet →

No rip-and-replace

Ganttry speaks the formats your owners, DOTs and subs already demand. Import the monthly update, review what changed group by group, apply it as one undo step — your notes, colors and costs untouched.

And when someone insists on Microsoft Project, export XML they can open natively. No hostage data, ever.

COMES IN
MS Project XML (MSPDI)
Primavera P6 XER
Excel & CSV with mapping presets
Re-imports that update in place
GOES OUT
Vector PDF with saved presets
Styled Excel + cash-flow sheet
MS Project XML — opens in MSP & P6
CSV & schedule JSON
$20 / user / month

Every feature. Every user. The admin, the scheduler, and the foreman checking his week all cost the same.

See pricing & sign up Reselling? Partner pricing →
Ganttry
everything included
$200 /user/yr
Microsoft Project Plan 3
desktop app tied to the plan
$432 /user/yr
Oracle Primavera P6
plus implementation & training
$2,500+ /user/yr
Published list prices, July 2026. Your negotiated rates may vary — the gap won't.

Put the whole crew on one schedule.

14-day trial · full feature set · import your current schedule in minutes

Start your 14-day trial See the demo first